Projects

Here you will find all projects that are financed within the Bio + program.

From forest to low greenhouse gas jet fuels with a developed catalytic pyrolysis technology

Bio-oils produced from wood by existing conversion technologies (e.g. pyrolysis) are incompatible with current jet engines and fuel infrastructure. Bio-oil instability, corrosivity,…

Manager: Hoda Shafaghat

Ongoing

Biogas Scenarios

Biogas is associated with several benefits, that can support a societal transition towards a circular economy with reduced climate impacts. The national…

Manager: Thomas Hans-Martin Magnusson

Ongoing

Large scale deodorization of kraft lignin for thermoplastics – a new testbed

Kraft lignin has a great potential to replace fossil-based materials in many applications due to its availability and molecular structure. However, its…

Manager: Katarina Ohlsson

Ongoing

Biochar stability validation – reaching a new level of understanding and transparency

Biochar produced from biomass has large potential to provide negative greenhouse gas emissions as a stable carbon sink in soil. A major…

Manager: Cecilia Sundberg

Ongoing

Bioflex – biobased energy carriers and their contribution to a flexible energy system

Bioflex aims at increasing the flexibility, redundancy, and robustness of the energy system by integrating biobased energy carriers (biohydrogen/biogas) with electrolytic hydrogen….

Manager: Erika Lönntoft

Ongoing

Lignin-based batteries

The project aims to develop new natural, water-based organic redox solutions based on lignin, such as electrolytes in a flow coil. These…

Manager: Christian Hulteberg

Ongoing

Check-in: moisture content – radiowave arrival measurement on roundwood and chip trucks

The moisture content of wood chips and fuel- and pulpwood is important for both logistics and industrial processes. Today’s methods for measuring…

Manager: Kari Hyll

Ongoing

Development of process monitoring for improved efficiency in thermochemical conversion of biomass

The overall goal of the project is to enable improved electric efficiency biomass boilers. This project aims to demonstrate and make use…

Manager: Klas Andersson

completed: 2026-03-27

1 11 12 13