Reserve power service based on biogas
This project is about a service for back-up power supply with biogas. It will develop overall technical and business concepts for such service, including installation of all infrastructure, biogas supply and maintenance. The customer will have full security of supply of electricity in short term as well as long-term power cuts.
Steve Karlsson
Småländska Bränslen AB
steve.karlsson@nokkonsult.se
Project information
Participants
Småländska Bränslen AB
Time schedule
March 2023 - April 2024
Total cost of project
636 720 SEK
Swedish Energy Agency project number
2022-01342
More projects

Maximizing biogenic carbon utilization by direct hydrogenation of biogas CO2 into electro-fuels
This research project explores a novel process for converting biogas CO2 directly into methanol and hydrocarbon electrofuels using hydrogen from renewable electrolysis,…
Manager: Derek Claude Creaser
Ongoing

Substitution of fossil-based carbon with lignin in furnace electrodes for the metallurgical industry
At present, the metallurgical industry is using large quantities of fossil-based carbons. For example, manufacturing of anodes and cathodes for the primary…
Manager: Peter Rättö
Ongoing

Copper smelter slag as bed material in fluidized bed combustion
This project examines the possibility to use granulated copper-smelter slag, järnsand in Swedish, as bed material in fluidized-bed combustion. Järnsand is a…
Manager: Magnus Rydén
Ongoing