Trading fossil and biogenic carbon emissions: Assessments of substitution effects for different value chains

The project takes a holistic perspective on the assessment of the important substitution factors that indicate the climate benefits of replacing emission-intensive materials and fuels with wood products. It includes replacing materials such as concrete and steel with wood-based products in the construction sector, fossil fuels with biofuels in the transportation sector, oil-based plastics with bioplastics in the manufacturing sector, as well as replacing fossil-based materials with bio-based ones in consumer product design and selection of materials.
The projects aims to empirically quantify substitution factors for five forest biomass value chains. Substitution factors take into account the characteristics of the wood products, the non-wood products they replace, differences in the life expectancy of the products and end-use management. The estimated substitution factors are used to assess the climate effect in different scenarios. New knowledge is produced that can be used as a basis for decisions.
Robert Lundmark
Luleå University of Technology
robert.lundmark@ltu.se
Project information
Participants
Luleå University of Technology
Time schedule
October 2023 - June 2025
Total cost of project
1 970 708 SEK
Swedish Energy Agency project number
2023-00826
More projects

Efficient biofuel production and logistics at terminals and industry
The project’s overall objective is to produce quality-assured knowledge that can be applied directly in practice and enables increased efficiency in the…
Manager: Erik Anerud
Ongoing

Improved forecasts of logging residues for precision planning
Today’s geopolitical situation and roadmaps towards fossil freedom have increased the demand for domestic forest fuels in Sweden. There is an ecological…
Manager: Raul Fernandez Lacruz
Ongoing

Biogas production from pelleted and briquetted straw, roadside grass and reeds
The EU Commission has a target of production of 350 TWh biomethane by 2030, and in Sweden a target of 10 TWh…
Manager: Anders Hjort
Ongoing